An owner reading this has unpermitted work on a California property, such as a garage conversion, an addition or rewired rooms, and a building department or code enforcement officer has asked for drawings of it. The work may predate the owner's purchase or inheritance, and the request may arrive inside a notice that also mentions fees, inspections and corrections. The questions in front of that owner are practical: what these drawings are, who makes them, and what they lead to, including when a sale is on the table.

As-built plans are drawings that show a structure exactly as it stands today, including work done without a permit. A California city or county building department asks for them so it can check that existing construction against the building code before it considers an after-the-fact permit. An architect, an engineer or, for some simpler jobs, another design professional usually prepares them.
On this page
What It Means for Owners
As-built plans, also called as-built drawings or record drawings, document a building as it was actually built, not as someone once designed it. They show dimensions, materials, room layout, structural elements, and the electrical, plumbing and mechanical systems as they exist in the field.
That sets them apart from two other kinds of drawings. Permit drawings are prepared before construction and show what an owner proposes to build. Architectural renderings are pictures meant to show how a design will look, and a building department does not review them for code.
The term "unpermitted work" means construction, an alteration or an addition finished without the building permit it required. For an owner with unpermitted work, as-built plans are the record a building department uses to decide whether what already exists meets code requirements. Without them, an inspector has no reliable way to evaluate the framing behind finished walls or the wiring and plumbing that feed a converted space.
Who It Affects
A request for as-built plans usually reaches an owner through one of two routes. In the first, the owner applies for a retroactive, or after-the-fact, permit: a permit sought for work already done. The building department then needs a record of what was built so it can review that work against the building code that applies. In the second, a code enforcement notice or correction order names as-built drawings as a condition of legalizing the work.
California cities and counties run their own building departments within the framework of the California Building Standards Code. Each department sets its own submittal rules. Some require drawings stamped by an architect or engineer. Others accept drawings from a contractor or a drafting professional for a simpler scope. This varies by city, by county and by the type of work. The general pattern appears across California, but no single statewide rule settles who must sign.
The owner commissions the drawings, and the design professional measures and documents the existing conditions on site. When stamped plans or structural calculations come into play, the case starts to look like a code case needing an architect. A permit expediter on a code case may coordinate paperwork with the department, but an expediter does not prepare the drawings. The local building department confirms who must sign and stamp for a given job.
Rules, Disclosures and Fine Print
On the permit side, legalization of unpermitted work generally follows this order:
- Identify the unpermitted work.
- Engage a design professional to document existing conditions.
- Submit the as-built drawings with a permit application.
- Building department plan review for code compliance.
- Scheduled inspections.
- Corrections, if the department requires them.
- Final permit sign-off.
Drawings come in at the application stage, not after approval. When existing construction falls short of current code, the building department may require corrections before it finals the permit, and the drawings are often what shows what has to change. Some jurisdictions run amnesty or streamlined programs for certain unpermitted work. Those programs still require drawings. Submitting drawings does not assure that a permit will be issued or that a violation will be closed. A converted garage or backyard unit follows this same path, with added steps described under unpermitted ADU legalization.
On the sale side, the disclosure article that begins at Civil Code section 1102 applies to the sale of a single-family residential property. Under section 1102(a) it also covers an exchange, a real property sales contract, a lease with an option to purchase, any other option to purchase, and a ground lease coupled with improvements, except as provided in Civil Code section 1102.2. Civil Code section 1102(c) states:
"Any waiver of the requirements of this article is void as against public policy."
The duties therefore do not change because a buyer pays cash or takes the property as it is. "As-is" describes the condition a buyer accepts, not a release from disclosure.
Civil Code section 1102.2 exempts some transfers based on who the buyer is or how the sale happens. The list includes "Sales or transfers from one coowner to one or more other coowners," transfers made to a spouse or to a person or persons in the line of consanguinity of one or more of the transferors, and transfers to or from any governmental entity. The list continues with court-ordered sales, foreclosure-related transfers, certain fiduciary sales and others. The disclosure duties are therefore not the same for every buyer.
Permit records, as-built drawings and the status of a pending or finished permit application all bear on what a seller describes about the property. A real estate attorney can review how disclosure applies to particular facts.
When the Work Cannot Be Legalized
As-built drawings do not always lead to a permit. Once the existing conditions are on paper and under review, the building department may conclude that some or all of the work cannot be brought into compliance as built.
In that situation, a notice or correction order can require the owner to remove the work rather than legalize it. Removal is not simply a matter of tearing things out: demolition may itself require a permit, and the notice states what the department expects. The drawings still serve a purpose here, because they record what exists and help show what has to come out. The same disclosure duties described above continue to apply if the property is sold while that question is open.
Options and Trade-offs
An owner facing a request for drawings usually ends up weighing a few paths, and none of them is free of cost.
Correct and legalize, then keep or sell. This is the path of commissioning as-built plans, applying for the permit and completing whatever corrections the department asks for. The owner pays design fees, permit and plan fees and the cost of correction work, and the department, not the owner, sets the pace of review. What it buys is a finaled permit, which can resolve the open status before any sale. The factors that drive those costs are covered under what it costs to fix code violations.
Sell with an agent while legalization is pending or not started. Here the unpermitted work travels with the property, and the buyer inherits the open permit status. Even so, drawings already prepared, or an application already on file, give a buyer a clearer picture of what they are taking on.
Sell directly to a buyer who pays cash and takes the property as it is. A direct offer often comes in below an open-market price, since the buyer is absorbing the repairs, the risk and the cost of reselling. In return, the seller usually deals with less preparation, fewer showings and less dependence on a buyer's loan. Disclosure still applies, as covered above, and any enforcement order stays in place.
Which path fits usually becomes clearer by comparing written offers side by side and looking at what each would actually leave the owner after commissions, repairs, carrying costs, loan payoffs and closing costs come out.
Mistakes to Avoid
Drawings that do not match the site. When an inspection finds conditions that differ from the submitted plans, the review can start over.
Treating drawings as a permit. Having plans prepared is one step. The permit application, plan review and inspections are separate steps.
A preparer whose credentials fall short. A building department can reject drawings when the person who prepared them does not meet its requirements for that scope of work.
Disclosing late, or counting on an as-is sale. Disclosure duties attach to the sale whether or not the permit is finished, and, as noted above, a cash or as-is sale does not remove them. Holding back unpermitted work until a sale is in contract creates problems.
Demolishing before reading the notice. Tearing out work in response to a code enforcement notice, before understanding what the notice requires, can create new trouble, because demolition may itself require a permit.
What to Do Next
The code enforcement notice or correction order is the controlling document. It states what the building department has asked for, whether it specifically requires as-built drawings, and for which part of the work. The local building department's submittal requirements for after-the-fact permits are usually published on the city or county building department's website. Those requirements set out who may prepare and stamp drawings for a given scope. How enforcement notices are structured is explained further under building code violations.
A dispute with a co-owner, a contractor or an agency is a contested matter handled by an attorney.
For many owners, the next practical step is to find the original notice or correction order and set it beside the building department's published after-the-fact permit checklist. Comparing the two shows which drawings the case actually calls for and whose stamp they need.
Ready to talk through your options?
Share the details of your notice. You choose whether contractors or a sale consultant may contact you.
Get help with my propertyFrequently asked questions
What will happen if I build without a permit?
Building without a permit can lead to a code enforcement notice, a stop-work order or a correction order requiring the owner to legalize or remove the work. Legalizing usually involves as-built drawings, plan review, inspections and any required corrections before a retroactive permit is finaled.
How do I get a permit after the work is already done?
An owner applies to the local building department for an after-the-fact permit. The application usually includes as-built drawings, followed by plan review and inspections. The department decides whether the work meets code and what corrections it requires, and it may decline to issue the permit.
What is the penalty for building without a permit in California?
Penalties are set locally and vary by city and county. Some jurisdictions charge higher fees for after-the-fact applications. The local building department publishes its current fee and penalty schedule.
Who can prepare as-built drawings for unpermitted work?
Architects and structural engineers prepare them most often. Some building departments accept drawings from a contractor or drafting professional for simpler jobs, while others require an architect's or engineer's stamp. The local building department sets the requirement for each scope of work.
What happens if an inspector finds unpermitted work?
A building official or code enforcement officer may issue a notice of violation or a correction order. The notice can require the owner to legalize the work through a retroactive permit or, in some cases, to remove it. The notice states what is required, and as-built drawings are often part of the legalization path.
Do I have to disclose unpermitted work when I sell my home in California?
The disclosure article at Civil Code section 1102 applies to the sale of single-family residential property, and section 1102(c) voids a waiver. Civil Code section 1102.2 exempts some transfers, such as those between co-owners or to a governmental entity.
Can I sell a house with unpermitted work in California?
Yes. A house can be sold in its present condition, and the buyer takes on the open permit status. A direct offer is often lower than an open-market price, so comparing written offers and estimated net proceeds shows which path fits.