Costs, Timing, and Trade-offs
Cost and time on each path come from specific features of the property and the jurisdiction, not from a standard price.
After-the-fact permitting depends on several things:
- the scope of the work
- the department's backlog
- whether plans have to be drawn from scratch
- whether inspections lead to corrections, such as opening walls, upgrading wiring or changing an egress window
A small, well-built project and a large conversion that needs structural changes can differ widely in cost and time.
Removal depends on the size and type of the structure, the cost of disposal, and whether the original structure has to be restored. Restoration might mean reinstalling a garage door, closing off plumbing, or returning a layout to its permitted plan. Removal also lowers the property's usable square footage or takes away a feature a buyer might have valued.
Sale in present condition has a trade-off in price. A buyer who accepts the unpermitted work takes on the risk and cost of permitting or removing it later. That buyer's offer usually reflects those costs, and it tends to be lower than what a fully permitted property might bring on the open market.
Comparing written offers and estimated net proceeds is how an owner tells which path fits financially. Net proceeds are the price less commissions, repairs, carrying costs, loan payoffs and closing costs. Carrying costs are what the owner pays to hold the property while work is done, such as mortgage payments, insurance and utilities. A higher price after permitting may net more or less than a sale in present condition, once permitting costs and months of carrying costs are subtracted.
An owner facing a notice to correct can find background on building code violations.